From: route@monster.com
Sent: Friday, April 08, 2016 12:12 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Andrea M. Perkins 3610 Harewood Ct Pearland, TX 77584 H: 281-412-3290 • C: 937-546-6943 • E: ramseya99@hotmail.com Experienced
Mechanical Engineer well versed in the full product cycle from conception to
completion with displayed ability to manage, plan, solve problems and
effectively deliver products and services within a given schedule and set
budget. Team-oriented engineer accomplished at working across departments and
disciplines with the ability to grasp new concepts and strategies. Education Wright
State University; Dayton, OH Bachelor of
Science, Mechanical Engineering, 2004 Experience The Dow
Chemical Company (contract)Houston, TX 01/2014 –
11/2015 Maintenance & Reliability Engineer/Technical
Writer · Acted
as subject matter expert in the identification, writing, reviewing, editing
and updating of maintenance procedures for rotating equipment (i.e. pumps,
compressors, steam turbines) · Wrote
clear, concise and accurate procedures describing technical material for both
technical and nontechnical audiences · Chair
and supported biweekly meetings and reviews to ensure that visibility was
provided on appropriate and required information · Collaborated
with other technical writers, engineering staff, management and other support
staff to facilitate document development and meet deadlines · Developed
the Predictive and Preventative Maintenance (PPM) schedules for all systems · Recognized,
evaluated and documented potential Failure Modes and effects of products and
processes (or equipment and components) Sulzer Pumps(contract)La
Porte, TX 07/2013 – 12/2013 Packaging
Applications Engineer · Worked
with and served as a liaison between sales representatives, territory
managers and distributors to design remanufactured pump skids based on
customer end-use specifications · Evaluated
the customer pump application requirements (BOM’s, RFQ's, drawings and
specifications) to insure that the company could produce a pump package that
would satisfy the customer's needs for competitive price and delivery while
providing an acceptable margin · Completed
design requirements by selecting the proper pump hydraulic performance.
Utilized sizing software and/or calculations to produce the desired head
& flow rate and chose suitable instrumentation & controls to
interconnect all components of the pump system · Obtained
estimates for manufacturing, material, and engineering costs, as well as
large auxiliary equipment items such as skids, piping, electric motors, lube
systems, seal systems and etc… · Determined
the cost for the entire pump packaging system and submitted a technical and
commercial proposal to the salesperson · Sourced
and purchased used pumps from open market for inventory and project orders · Supported
sales representatives and attended customer face to face meetings · Documented
and maintained all company bid details in an Excel database that consisted of
customer, vendors/suppliers used for RFQ’s and all associated pricing for
labor, material and equipment used for cost analysis purposes Weatherford
International Corp. Houston, TX 01/2013 – 07/2013 R&D
Project
Engineer
· Prepared
conceptual drawings, layouts and calculations utilizing Creo, AutoCad and
Mathcad · Planned
work schedules for equipment and personnel to complete project safely and
efficiently · Selected
materials and processes to achieve cost and performance objectives · Developed
and checked technical procedures, safety / quality plans, drawings and
layouts · Assembled,
tested prototypes, developed test procedures and documentation for all
results · Assisted
with tracking costs and revenues for each project and with invoicing GE Oil
& GasHouston, TX 10/2010 – 01/2013 Manufacturing/Cost
Engineer · Houston
Service Center focal responsible for developing and maintaining the repair
shop catalogue for all cost data utilizing Oracle, SAP Business Objects and
Microsoft Excel · Developed
and implemented a comprehensive cost control procedure for labour (time),
material and equipment expenditures · Interacted
daily with the shop, to understand repair's job cost structure, seeking new
solutions for lead time reduction and building day by day the new catalogue · Ensured
cost collection / quality of services/manufactured products, communicating
with the material manager, project managers, production team, technical leads
and etc… · Reviewed
and determined representative jobs for catalogue, analyzing the variance
between actual and standard costs · Managed
recurring repair shop catalogue audit · Participated
in proactive risk mitigation, forecasting, cost tracking, and reporting
activities · Evaluated
cost / benefits for projects to drive lean shop productivity projects Engineering
Planner/Scheduler · Acted
as the key planning point of contact for Engineering and interface between
the Commercial team, PM and Global Supply Chain Management (GSCM) · Took
leading role in creating engineering schedules, worked with engineering
managers to review the plans and focus / prioritize resources to reach the
target, maintained and managed the overall Engineering schedule · Established
and maintained a consistent operating routine to ensure project progress
reports were generated and issued on time · Lead
analysis of the schedule impact due to external variation orders · Created
planning templates, supported development of Primavera (P6) tool and time
vouchering in P6 · Developed
and maintained a forecasting process to plan Engineering · Partnered
with PM and GSCM to define schedule requirements and confirm lead times for
new orders · Reviewed
the schedules and drove communication to the business of risk areas and
mitigation plans needed to project on-time delivery · Lead
process improvements within the team and across functions to deliver more
accurate project updates, identify risk areas and improve on-time delivery GE Energy
(contract) Houston, TX 10/2008 – 10/2010 Mechanical
Design Engineer · Supported
NPI mechanical design projects and cost reduction projects of
turbine/generator combos used for power generation · Worked
with 3D and 2D CADD designers to create design layouts and associated
assembly, fabrication drawings and bill of materials · Created
F&ID/P&IDs and specification of associated parts, including the
creation of technical specifications and working with sourcing and vendors to
obtain quotes and cutsheets · Maintained
product line standard drawings and bill of materials · Supported
manufacturing, design reviews, tollgate processes, supplier meetings,
requisition and field engineering · Executed
the design, analysis, or evaluation of assigned projects, adhering to
business standards, practices, procedures, and product / program requirements · Provided
timely communications on significant issues or developments · Assured
proper documentation of technical data generated for the assigned projects
and/or tasks was consistent with engineering policies and procedures Essig
Research Inc.Cincinnati, OH 10/2004 - 08/2008 Project
Engineer · Provided
engineering services to General Electric Aviation in the form of project engineering,
repair development and technical writing · Worked
in conjunction with project managers to ensure that project scope of work and
design parameters were clearly defined · Maintained
technical liaison with customers and vendors related to multiple project
matters · Responsible
for generating a project schedule to show milestones, deliveries, etc. and
keep updated and disseminated · Coordinated
and assigned workload to subsidiary offices, communicating project scope,
timelines and billable hours · Tracked
the progress of engineers/designers for quality and continuous improvement
purposes and routinely monitored work for compliance to applicable codes,
accepted engineering practices and company standards · Generated
AutoCAD drawings, technical paperwork and supporting forms associated with a
project as required; updating and maintaining both an electronic and hard
copy project log · Led
the company to a successful initial ISO 9001:2000 certification and supported
continuous audit and quality compliance efforts Professional
Training/Certifications Six Sigma
Green Belt – January 2012 Project
Management Professional (PMP) – expected March 2016 Professional
Organizations American
Society of Mechanical Engineers (ASME) Project
Management Institute (PMI) Andrea M.
PerkinsPage 1 |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|